One of the biggest reasons people put off air conditioning is simply not knowing what to expect. Will it be messy? How long will it take? Will there be holes everywhere? This guide walks through the whole process, from your first call to a finished, working system, so you know exactly what happens and when.
Step 1: The free survey
Every good installation starts with a proper look at your home. We do not quote air conditioning from a photo of the front of the house, because the details that matter are inside and round the back.
At the survey we look at:
- which rooms overheat, when, and how you use them
- the size of each room, the glazing and which way it faces, so the system is sized properly
- where the indoor unit can sit so the airflow suits the room
- the best route for pipework and cables, inside and out
- where the outdoor unit can go, with access for servicing and consideration for neighbours
- your electrical supply and where the isolator will go
- for ducted systems, the loft or ceiling void space
- whether anything like a listed building, flat or conservation area needs checking for permission
There is no obligation. If we think air conditioning is not the right answer, we will say so.
Step 2: Your quote
Quotes usually arrive within 24 to 48 hours of the survey. A good quote should tell you, in plain English:
- the equipment, with model names
- where each unit goes and how the pipework will run
- what is included: brackets, trunking, condensate drainage, electrics, commissioning
- how VAT is applied (some qualifying installations are currently zero-rated, see our 0% VAT guide)
- a fixed price
Our Fixed-Price Guarantee means the price we quote is the price you pay. Payment terms are set out clearly in the quote before you agree to anything.
Step 3: Booking and preparation
Once you accept, we agree an installation date and order the equipment. Before the day, we will let you know if there is anything to prepare, such as clearing space under the indoor unit position, moving the car, or making sure we can get into the loft.

Step 4: Installation day
How long it takes depends on the system. A single room is usually done in a day. Multi-room and ducted systems take longer, and we give you a clear timeline before we start. Here is the order things usually happen in.
Protecting your home
Dust sheets go down first, around the work area and along the route we will walk. We keep tools together and tidy as we go.
Indoor unit and pipe route
The mounting plate goes on the wall, and we core a neat hole through to the outside for the refrigerant pipes, power and communication cable and condensate drain. On ducted systems, the indoor unit is fitted in the loft or ceiling void, the ductwork is run to each room and the grilles are cut in.
Outdoor unit
The outdoor unit goes on wall brackets or ground-level feet. Anti-vibration mounts stop it humming through the building. Pipework outside is run in trunking for a tidy finish.
Connecting up
The refrigerant pipes are connected between the units and the condensate is routed to a suitable drain, or to a small pump where gravity will not do it.
Pressure test and vacuum
This is the bit you will not see in the finished job, but it matters most. The pipework is pressure tested to check for leaks, then evacuated with a vacuum pump to remove air and moisture before the refrigerant is released into the system. Skipping or rushing this stage is one of the most common causes of problems later on. It is also why the work has to be done by an F-Gas certified engineer.
Commissioning
Once the system is running, we check it is heating and cooling properly, the drain is clearing and the controls are working.

What to expect while we are there
- Some noise when the wall is cored. It is short-lived, and we warn you first.
- Power off briefly while the electrical connection is made.
- Loft or ceiling access for ducted systems.
- A tidy finish. Our Clean-Up Guarantee means if we do not leave your home tidy, we pay you £50.
- Turning up when we said. Our Show-Up Guarantee means £50 off if we are late.
Step 5: Handover
Before we leave, we walk you through your controls and the app, so you know how to switch between heating and cooling, set timers and use the quieter modes. Ask us to show you where the filters are and how to keep them clean.
Your installation is covered by our 12-month workmanship guarantee. For Toshiba systems, we can register your equipment for a manufacturer warranty of up to 7 years, provided it is registered and serviced annually.
Step 6: Aftercare
Air conditioning needs regular servicing to stay efficient and hygienic, and annual servicing keeps the extended Toshiba warranty valid. We can book that in for you. See our air conditioning servicing page for details.
Want to see the finished result? Have a look at our air conditioning case studies, read about our air conditioning installation service, check our prices, or book your free survey.
Questions we get asked
How long does an air conditioning installation take?
A single room is usually done in a day. Multi-room and ducted systems take longer, and we give you a clear timeline before we start.
Is it messy?
Coring the wall creates some dust, which we control and clean up. Dust sheets go down first, and our Clean-Up Guarantee backs it up.
Do I need to be at home?
Someone needs to let us in, agree the final positions with us at the start, and be there for the handover at the end.
Will I need planning permission?
Most homes do not, but some properties, such as listed buildings, flats and homes in conservation areas, may. We check this with you at the survey.
What does the outdoor unit need?
A solid wall or level base, airflow around it, and access for servicing. We will suggest the best spot at the survey.
Ready when you are
Tell us what you need and we will come back to you with a clear, fixed price. No pressure, no hard sell.
Ready when you are
Tell us what you need and we will come back to you with a clear, fixed price. No pressure, no hard sell.